MENÜ
Griffner Haus

Make
an
appointment >

Make an
appointment

+43
Please make an appointment with me

Is a plot of land available?

When do you want to move in?

Subscribe to our newsletter

* I consent to the use and storage of my data for the purposes of communication with the company. I may revoke my consent at any time. (data protection)





ORDER free
catalogues now >

ORDER free
catalogues now
Please select the desired catalogs:

trueGRIFFNER
BUNGALOW
trueGRIFFNER
BOX
trueGRIFFNER
SQUARE
trueGRIFFNER
CLASSIC
Please fill out your information below:

+43
How would you like to receive the catalog?
as PDF by E-Mailas catalog by post


Subscribe to our newsletter

I consent to the use and storage of my data for the purposes of communication with the company. I may revoke my consent at any time. (data protection)






Please also select your desired catalog(s)!
/

CONSTRUCTION STAGES

Construction stage 1

Your GRIFFNER house will be finished on the outside within a fortnight or so. The walls and ceilings of the building are in place, windows and doors have been fitted, the roof covering is on and preparations for the installation work have already been made.

  • Timber structure using Austrian wood
  • Three-skin wall structure (energy2+ wall) with installation layer inside (U-value=0.12 W/m²K)
  • energy2+ saddle roof as standard
    (U-value = 0.13 W/m²K)
  • Ecological building materials: wood, gypsum fibreboard,wood fibre and cork
  • Summertime thermal protection and perfect sound insulation with three-skin wall structure
  • Exposed wooden ceiling as a solid-timber structure with flat roof, wood beam ceiling for CLASSIC
  • Wood-aluminium windows supplied as standard
  • Triple thermal glazing, Ug ≤ 0.7 W/m²K
  • Safety glass for all French windows
  • Flat roof made of cross-laminated timber
  • Dry construction – for a healthy home environment from the outset
  • Windowsills and kick plates made from high-quality coated aluminium
  • Transport, assembly, crane and waste disposal including roof drainage

Construction stage 2

We supply your house with the necessary technical equipment. All building services will be installed in just a few weeks. This includes the environmentally friendly heat pump, underfloor heating, sanitary connections and electrics. Installation is followed by the application of a floating solid screed.

  • Environmentally friendly heating without using fossil fuels such as oil or gas
  • Energy-efficient heat pump technology
  • Installation of sanitary pipework
  • Electrical installation including main distribution
  • Solid screed for perfect sound insulation and heat storage

Construction stage 3

Your house now becomes a home. The final construction stage involves the internal fit-out: Painting, installation of wall and floor tiles and fitting of internal doors and staircase. If you entrust GRIFFNER with all construction work, your house will be finished in a matter of months. Final acceptance is performed by the project manager and yourself.

  • Real wood parquet flooring in all living areas and bedrooms
  • High-quality tiles, perfectly matched in terms of colour
  • Internal doors with real wood veneer
  • Walls and sloping ceilings plastered and painted
Facebook LinkedIn Xing Twitter E-Mail